The Mayor of Accra, Michael Kpakpo Allotey, has directed the temporary closure of the Kaneshie footbridges following the discovery of serious structural defects during an inspection.
The directive, issued on Wednesday, is intended to safeguard lives as urgent repair works are set to begin. During the visit, the Mayor instructed traders and commuters occupying the bridges and nearby areas to vacate immediately to allow for renovation.
He stressed that the Assembly would not compromise on public safety, particularly in light of recent structural failures recorded across the city.

Mr Allotey warned that individuals who defy the directive or attempt to use the bridges unlawfully will face legal consequences.
Speaking to the media, he indicated that the Assembly will utilise its Internally Generated Funds (IGF) to commence preliminary repair works while seeking additional financial support from central government.
He revealed that sections of the footbridges have significantly deteriorated, with exposed metal reinforcements and cracked concrete highlighting the urgency of the situation.
The Mayor also called on residents to report unsafe buildings and developments within their communities, assuring them of swift enforcement of engineering and safety standards.
As part of broader safety efforts, he announced plans to collaborate with Metropolitan, Municipal and District Chief Executives (MMDCEs) to conduct joint inspections in areas such as Adenta, School Junction, Dansoman, and Agbogbloshie.
The initiative, led by the Greater Accra Regional Minister, Linda Obenewaa Akweley Ocloo, will target unsafe structures, with non-compliant buildings facing possible demolition.
Reaffirming his administration’s priorities, the Mayor said improving infrastructure, enforcing regulations, and ensuring public safety remain central to building a resilient and sustainable Accra.

Also present at the inspection, Ablekuma Central Municipal Chief Executive Frank Nkansah attributed the deterioration to prolonged occupation of the footbridges by traders, which has hindered routine maintenance.
He noted visible signs of decay, including rusted components and damaged structural elements.
Director of the Department of Urban Roads, James Oduro Amoo-Gottfried, подтвердил that the bridges are in poor condition and require urgent intervention, supporting the decision for partial closure.
He added that temporary alternative routes, including designated pedestrian crossing points along the median of the Dr. Busia Highway, will be created to ensure safe movement while repair works are underway.